Published: 12/11/2023

9PE One2Clean Install for Private Home

Problem

Drain-Age faced a challenging situation at a seven-bedroom private house situated in 17 acres of landscaped gardens near the New Forest in Hampshire. The property had a deteriorating brick septic tank, causing poor-quality discharge into a nearby stream. The tank was further compromised by surface water penetration and previous ineffective conversion attempts. This scenario posed environmental risks and failed to comply with Environmental Agency discharge regulations.

Solution

Drain-Age, leveraging their extensive experience and recent training with Graf UK, proposed the installation of a Graf UK wastewater treatment plant. Their approach was to replace the failing system with Graf’s One2Clean treatment plant, known for its low-energy, low-noise, and cost-effective operation. This decision was bolstered by Drain-Age's proactive strategy of holding a comprehensive stock of Graf UK products, enabling rapid response and installation. The team meticulously planned and executed the installation process over four days, ensuring minimal disruption to the client’s property and landscape.

Results

The entire installation process, from ground preparation to final certification, was completed in just four days. This swift execution was possible due to Drain-Age’s ready stock of Graf UK systems and their efficient project management. The newly installed Graf One2Clean system not only rectified the poor-quality discharge issue but also exceeded industry standards in wastewater treatment. It offered a sustainable and eco-friendly solution, aligning with environmental regulations. The client received a high-quality, reliable solution that enhanced their property’s value and ensured compliance with environmental standards. The process was completed with minimal disruption to the property's extensive landscaped gardens.

The Graf One2Clean system, known for its minimal sludge production and low electricity costs, promised long-term financial and environmental benefits. Its future-proof design and potential for further upgrades like carbon and phosphate dosing make it an ideal choice for sensitive sites.

Drain Age’s decision to use Graf UK products, based on their robustness and hassle-free nature, positioned them as a leader in ecological wastewater solutions. Their ability to quickly meet client needs and provide top-tier installations reinforced their reputation in the industry. This installation highlights Drain-Age's commitment to providing rapid, efficient, and environmentally conscious solutions, with Graf UK's products playing a pivotal role in achieving these objectives.

Testimonial

As specialists in wastewater treatment solutions, we at Drain-Age have had the opportunity to work with various products in our industry. However, our experience with Graf UK’s sewage treatment plants has been exceptional. These products not only meet but exceed our expectations, perfectly aligning with our standards and client needs. We wholeheartedly recommend Graf UK for their reliability and innovative approach, which have been a breath of fresh air in our industry. Graf UK is more than just a supplier; they are a trusted partner in our mission to provide high quality wastewater treatment solutions for our clients.



Your contact
Callum Vallance-Poole

Callum Vallance-Poole
+44 (0) 1295 675 493

callum@grafuk.co.uk

Back to overview